Project Summaries
Contract Manufacturing Organization –
Product Lifecycle Management (PLM) System Replacement
The Challenge
A large global CMO desired to replace an
existing Product Lifecycle Management System. The new system would be
housed at a corporate location, accessed globally and house all product
data and documentation. The project team was a diverse group
consisting of the CMO, the software vendor, the software integrator, and
Performance Validation.
The Solution
Performance Validation provided a dedicated team with a Project Leader experienced with managing IT validation projects and interfacing effectively with diverse project teams. A risk based approach was executed to reduce and eliminate un-necessary or redundant testing.
-
The Validation Plan identified the classification and strategy associated with the IT Infrastructure components, the application (GAMP5 category 4), and two JAVA based Applets that were developed to support a unique reporting function (GAMP5 category 5).
- A risk based approach was taken to reduce the qualification burden. This approach consisted of auditing the software vendor to evaluate: a) the software vendor’s quality system, b) the software development methodology in use and software development testing, and c) the software vendor testing of the base functionality of the software. Based on the vendor audit results limited functional testing of the core application was performed.
-
The Validation strategy included:
- Qualification of the IT
Infrastructure elements. The existing servers, OS, and other
infrastructure software were evaluated to verify the
infrastructure elements met the minimum recommended requirements
of the application.
- Configuration of the application was
documented by the integrator. The configuration was evaluated
through the use of Conference Room Pilots (CRP) where the
application was dry-run by the client using the draft workflow
or use cases. The configuration and workflows were modified
based on CRPs and finalized and approved.
- IQ of the application verified build
/version installation of the application and testing of the
configuration.
- OQ – testing core functionality of
the application was not performed based on the
vendor audit.
- PQ of the application focused on
execution of the work flows from the user requirements. The
workflows verified the proper configuration of the software,
verified functionally of software and that the software was
suitable for its intended use. This testing also included
verification of operational and maintenance SOPs necessary to
maintain a validated state and client specific procedures
necessary to confirm 21 part 11 compliance. PQ also included
functional testing of the two Java Applets and workflow testing
to demonstrate the applets were suitable for their intended use.
- Validation deliverables included:
- Validation Plan
- User requirements (IT
Infrastructure and Workflow)
- Functional requirements
(Elements outside of core functionality)
- Configuration
- Code review of the JAVA applets
- IQ and IQ Summary
- PQ and PQ Summary
- Trace Matrix to trace
requirements to testing
- Validation plan summary report.
- Validation Plan
- Qualification of the IT
Infrastructure elements. The existing servers, OS, and other
infrastructure software were evaluated to verify the
infrastructure elements met the minimum recommended requirements
of the application.
The Results
- The Product Lifecycle Management system was successfully implemented, validation was completed and the system was released for operational use.
The Benefits
Using a risk based approach to validate an
off the shelf configured application allowed the client to focus on
verifying that the application and supporting infrastructure was
suitable for its intended use. Focus was placed on verification
that the IT Infrastructure met the requirements to run the application
(given an assumed user load), that the application was configured
correctly and finally that the workflows met the end users needs (user
requirements).
Core functional testing of the application was performed by the software vendor. This testing demonstrated core functionality of the software and was not repeated. This approach reduced project cost, schedule and reduced the volume of the validation effort to what is truly necessary and value add to the client.